Integrating order release control with due-date assignment rules
From MaRDI portal
Recommendations
- Integration of priority dispatching and due-date assignment in a job shop
- Regression-based due date assignment rules for improved assembly shop performance
- Dynamic assignation of due-dates in an assembly shop based in simulation
- An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
- A due date assignment algorithm for multiproduct manufacturing facilities
Cited in
(8)- Concerning the theory of workload control
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Dynamic job shop scheduling for missed due date performance
- A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem
- Real-time due-date promising by build-to-order environments
- Heuristic dispatching rule to maximize TDD and IDD performance
- Development of a regression-based method with case-based tuning to solve the due date assignment problem
- Optimization-based available-to-promise with multi-stage resource availability
This page was built for publication: Integrating order release control with due-date assignment rules
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245383)