Heuristic dispatching rule to maximize TDD and IDD performance
From MaRDI portal
Recommendations
- New dispatching rules for shop scheduling: A step forward
- Dispatching rules for scheduling in assembly jobshops - Part 2
- A comparison of job shop dispatching rules using a total cost criterion
- An evaluation of value based dispatching rules in a flow shop
- A comparative study of dispatching rules in dynamic flowshops and jobshops
Cites work
- A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem
- An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
- Improved heuristics for the n-job single-machine weighted tardiness problem
- Integrating order release control with due-date assignment rules
- Mixing macro and micro flowtime estimation model: Wafer fab example
- The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs
This page was built for publication: Heuristic dispatching rule to maximize TDD and IDD performance
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4671362)