Mixing macro and micro flowtime estimation model: Wafer fab example
From MaRDI portal
Recommendations
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- Investigation of flow mechanisms in semiconductor wafer fabrication
- Real-time prediction of order flowtimes using support vector regression
- Dynamic operator assignment based on shifting machine loading
- A Hybrid and Intelligent System for Predicting Lot Output Time in a Semiconductor Fabrication Factory
Cited in
(5)- Reducing simulation models for scheduling manufacturing facilities
- Real-time prediction of order flowtimes using support vector regression
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory
- Investigation of flow mechanisms in semiconductor wafer fabrication
- Heuristic dispatching rule to maximize TDD and IDD performance
This page was built for publication: Mixing macro and micro flowtime estimation model: Wafer fab example
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4497068)