Real-time prediction of order flowtimes using support vector regression
From MaRDI portal
Publication:2483499
DOI10.1016/j.cor.2007.01.026zbMath1159.90356MaRDI QIDQ2483499
Theodore B. Trafalis, Abdulrahman Alenezi, Scott A. Moses
Publication date: 28 April 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2007.01.026
90B30: Production models
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Optimal due-date assignment and sequencing
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Practical selection of SVM parameters and noise estimation for SVM regression
- Optimal Lead Time Policies
- Approximations for the time spent in a dynamic job shop with applications to due-date assignment
- A Proof for the Queuing Formula: L = λW
- Due Date Assignment for Production Systems
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- Due-Dates and Instantaneous Load in the One-Machine Shop
- Dynamic assignation of due-dates in an assembly shop based in simulation
- Real-time due-date promising by build-to-order environments
- Optimal TWK-power due-date determination and sequencing
- Quoting Customer Lead Times
- Single Facility Due Date Setting with Multiple Customer Classes