The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times (Q1000165)

From MaRDI portal





scientific article; zbMATH DE number 5502945
Language Label Description Also known as
default for all languages
No label defined
    English
    The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times
    scientific article; zbMATH DE number 5502945

      Statements

      The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times (English)
      0 references
      0 references
      5 February 2009
      0 references
      Summary: We address the three-machine flowshop scheduling problem to minimise maximum lateness, where setup times are considered separate from processing times. We establish a dominance relation for the problem where it specifies which of the two adjacent jobs should precede in an optimal solution. Moreover, we propose three heuristics: Earliest Due Date (EDD), an Enhanced Earliest Due Date (EEDD) and a Polynomial Genetic-based Algorithm (PGA). We conduct computational analysis on randomly generated problems to evaluate the performance of the proposed heuristics. The analysis shows that the performance of EEDD is acceptable if the computational time is of the main concern and the number of jobs are large. The analysis also shows that PGA significantly outperforms EDD and EEDD.
      0 references
      dominance relation
      0 references
      heuristics
      0 references
      setup times
      0 references
      operational research
      0 references