Productivity formulas for a partially penetrating vertical well in a circular cylinder drainage volume (Q1036408)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Productivity formulas for a partially penetrating vertical well in a circular cylinder drainage volume
scientific article

    Statements

    Productivity formulas for a partially penetrating vertical well in a circular cylinder drainage volume (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    13 November 2009
    0 references
    Summary: Taking a partially penetrating vertical well as a uniform line sink in three-dimensional space, by developing necessary mathematical analysis, this paper presents steady state productivity formulas for an off-center partially penetrating vertical well in a circular cylinder drainage volume with constant pressure at outer boundary. This paper also gives formulas for calculating the pseudo-skin factor due to partial penetration. If top and bottom reservoir boundaries are impermeable, the radius of the cylindrical system and off-center distance appears in the productivity formulas. If the reservoir has a gas cap or bottom water, the effects of the radius and off-center distance on productivity can be ignored. It is concluded that, for a partially penetrating vertical well, different productivity equations should be used under different reservoir boundary conditions.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers