Productivity formulas for a partially penetrating vertical well in a circular cylinder drainage volume (Q1036408)
From MaRDI portal
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Productivity formulas for a partially penetrating vertical well in a circular cylinder drainage volume |
scientific article |
Statements
Productivity formulas for a partially penetrating vertical well in a circular cylinder drainage volume (English)
0 references
13 November 2009
0 references
Summary: Taking a partially penetrating vertical well as a uniform line sink in three-dimensional space, by developing necessary mathematical analysis, this paper presents steady state productivity formulas for an off-center partially penetrating vertical well in a circular cylinder drainage volume with constant pressure at outer boundary. This paper also gives formulas for calculating the pseudo-skin factor due to partial penetration. If top and bottom reservoir boundaries are impermeable, the radius of the cylindrical system and off-center distance appears in the productivity formulas. If the reservoir has a gas cap or bottom water, the effects of the radius and off-center distance on productivity can be ignored. It is concluded that, for a partially penetrating vertical well, different productivity equations should be used under different reservoir boundary conditions.
0 references