Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (Q1060679)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 3908139
Language Label Description Also known as
default for all languages
No label defined
    English
    Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times
    scientific article; zbMATH DE number 3908139

      Statements

      Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (English)
      0 references
      0 references
      0 references
      1985
      0 references
      The problem to be considered is one of scheduling n jobs in a two-machine flow shop. Jobs are characterized by processing times and set-up times. Moreover, some subsets of jobs are to be processed in a no-wait mode before specified deadlines. The objective is to find a schedule of minimum length. In the paper an optimization algorithm is proposed, its complexity, however, is not evaluated.
      0 references
      deadline scheduling
      0 references
      two-machine flow shop
      0 references
      processing times
      0 references
      set-up times
      0 references
      schedule of minimum length
      0 references
      algorithm
      0 references

      Identifiers