Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (Q1060679)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 3908139
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times |
scientific article; zbMATH DE number 3908139 |
Statements
Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (English)
0 references
1985
0 references
The problem to be considered is one of scheduling n jobs in a two-machine flow shop. Jobs are characterized by processing times and set-up times. Moreover, some subsets of jobs are to be processed in a no-wait mode before specified deadlines. The objective is to find a schedule of minimum length. In the paper an optimization algorithm is proposed, its complexity, however, is not evaluated.
0 references
deadline scheduling
0 references
two-machine flow shop
0 references
processing times
0 references
set-up times
0 references
schedule of minimum length
0 references
algorithm
0 references
0.8191273808479309
0 references
0.8180365562438965
0 references
0.8158331513404846
0 references
0.8134840726852417
0 references