Optimal preventive maintenance, protection, and replacement of a revenue- earning asset (Q1106716)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 4062802
Language Label Description Also known as
default for all languages
No label defined
    English
    Optimal preventive maintenance, protection, and replacement of a revenue- earning asset
    scientific article; zbMATH DE number 4062802

      Statements

      Optimal preventive maintenance, protection, and replacement of a revenue- earning asset (English)
      0 references
      0 references
      1987
      0 references
      The author discusses the problem of determining the optimum schedule of expenditure on preventive maintenance or protection for a revenue-earning asset subject to catastrophic breakdown or destruction. The expenditure on prevention or protection is assumed to occur continuously. The probability of breakdown depends on the age of the asset and on the current rate of prevention expenditure. The objective considered is the maximization of the expected present value of revenues earned net of prevention and replacement costs. Use of the Pontryagin maximum principle enables the determination of the optimal prevention schedules in three cases: (a) when revenue is earned only until breakdown; (b) when there is automatic replacement, at a cost, following breakdown; and (c) when there is the option of periodic replacement.
      0 references
      preventive maintenance
      0 references
      catastrophic breakdown
      0 references
      Pontryagin maximum principle
      0 references
      0 references
      0 references

      Identifiers