Controlled alternative activity networks for project management (Q1107431)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Controlled alternative activity networks for project management
scientific article

    Statements

    Controlled alternative activity networks for project management (English)
    0 references
    1988
    0 references
    This paper presents a branching network to control a project with two different types of alternative events. The first one reflects stochastic (uncontrolled) branching of the development of a project. The alternative event of the second type is of a deterministic nature, i.e., the project's decision-maker chooses the outcome direction. Such a network contains alternative nodes with different logical operations at the input and output and includes both connective and diverging paths. The problem of controlling a project is, in essence, the choosing of an optimal outcome direction at every `decision-making' node which is reached in the course of the project's realization. This is carried out by a permanent reduction of the initial network and by applying a special algorithm described here, based on lexicographical scanning. A numerical example is given and application areas are presented.
    0 references
    controlled alternative activity networks
    0 references
    project management
    0 references
    outcome graph
    0 references
    joint variant
    0 references
    admissible plan
    0 references
    lexicographical order
    0 references
    branching network
    0 references
    two different types of alternative events
    0 references
    lexicographical scanning