On the two-phase method for preemptive scheduling (Q1107434)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 4064758
Language Label Description Also known as
default for all languages
No label defined
    English
    On the two-phase method for preemptive scheduling
    scientific article; zbMATH DE number 4064758

      Statements

      On the two-phase method for preemptive scheduling (English)
      0 references
      0 references
      1988
      0 references
      Preemptive scheduling problems on parallel processors may in some cases be solved by a two-phase method: first solve an LP problem which will give the minimum total completion time T and the processing times of the jobs on the various processors; second construct a feasible schedule using T time units. Some extensions of this procedure are discussed. A general model for preemptive scheduling is described with a two-phase method for solving problems of this type.
      0 references
      total unimodularity
      0 references
      flexible manufacturing systems
      0 references
      Preemptive scheduling
      0 references
      parallel processors
      0 references
      two-phase method
      0 references
      minimum total completion time
      0 references

      Identifiers

      0 references
      0 references
      0 references
      0 references
      0 references
      0 references
      0 references