Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness (Q1715728)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness |
scientific article; zbMATH DE number 7007488
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness |
scientific article; zbMATH DE number 7007488 |
Statements
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness (English)
0 references
29 January 2019
0 references
scheduling
0 references
no-wait
0 references
flowshop
0 references
uncertain setup times
0 references
maximum lateness
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0.8790474534034729
0 references
0.8685831427574158
0 references
0.8468335270881653
0 references
0.8457542657852173
0 references
0.8231135606765747
0 references