A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure (Q1983744)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7394173
Language Label Description Also known as
default for all languages
No label defined
    English
    A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure
    scientific article; zbMATH DE number 7394173

      Statements

      A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure (English)
      0 references
      0 references
      0 references
      0 references
      0 references
      10 September 2021
      0 references
      flowshop
      0 references
      scheduling-no-wait-two-machine-maxium
      0 references
      lateness-uncertain setup times
      0 references

      Identifiers