Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time (Q1720427)

From MaRDI portal





scientific article; zbMATH DE number 7018502
Language Label Description Also known as
default for all languages
No label defined
    English
    Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time
    scientific article; zbMATH DE number 7018502

      Statements

      Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time (English)
      0 references
      0 references
      0 references
      8 February 2019
      0 references
      Summary: An extension of the integrated production-delivery lot sizing model with limited production capacity and transportation cost is investigated. We introduce the factor of overtime work into the model to improve the manufacturer's production. In addition, when finishing a lot, the manufacturer has maintenance time to maintain and repair equipment for ensuring that the supply chain is operating continuously. By analyzing the integrated model, the solution procedure is provided to determine the optimal delivery and order policy. We conduct a numerical experiment and give sensitive analysis by varying some parameters to illustrate the problem and its solution procedure.
      0 references

      Identifiers

      0 references
      0 references
      0 references
      0 references
      0 references
      0 references