An improved multiobjective PSO for the scheduling problem of panel block construction (Q1727458)

From MaRDI portal





scientific article; zbMATH DE number 7026883
Language Label Description Also known as
default for all languages
No label defined
    English
    An improved multiobjective PSO for the scheduling problem of panel block construction
    scientific article; zbMATH DE number 7026883

      Statements

      An improved multiobjective PSO for the scheduling problem of panel block construction (English)
      0 references
      0 references
      20 February 2019
      0 references
      Summary: Uncertainty is common in ship construction. However, few studies have focused on scheduling problems under uncertainty in shipbuilding. This paper formulates the scheduling problem of panel block construction as a multiobjective fuzzy flow shop scheduling problem (FSSP) with a fuzzy processing time, a fuzzy due date, and the just-in-time (JIT) concept. An improved multiobjective particle swarm optimization called MOPSO-M is developed to solve the scheduling problem. MOPSO-M utilizes a ranked-order-value rule to convert the continuous position of particles into the discrete permutations of jobs, and an available mapping is employed to obtain the precedence-based permutation of the jobs. In addition, to improve the performance of MOPSO-M, archive maintenance is combined with global best position selection, and mutation and a velocity constriction mechanism are introduced into the algorithm. The feasibility and effectiveness of MOPSO-M are assessed in comparison with general MOPSO and nondominated sorting genetic algorithm-II (NSGA-II).