An improved multiobjective PSO for the scheduling problem of panel block construction (Q1727458)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: An improved multiobjective PSO for the scheduling problem of panel block construction |
scientific article; zbMATH DE number 7026883
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | An improved multiobjective PSO for the scheduling problem of panel block construction |
scientific article; zbMATH DE number 7026883 |
Statements
An improved multiobjective PSO for the scheduling problem of panel block construction (English)
0 references
20 February 2019
0 references
Summary: Uncertainty is common in ship construction. However, few studies have focused on scheduling problems under uncertainty in shipbuilding. This paper formulates the scheduling problem of panel block construction as a multiobjective fuzzy flow shop scheduling problem (FSSP) with a fuzzy processing time, a fuzzy due date, and the just-in-time (JIT) concept. An improved multiobjective particle swarm optimization called MOPSO-M is developed to solve the scheduling problem. MOPSO-M utilizes a ranked-order-value rule to convert the continuous position of particles into the discrete permutations of jobs, and an available mapping is employed to obtain the precedence-based permutation of the jobs. In addition, to improve the performance of MOPSO-M, archive maintenance is combined with global best position selection, and mutation and a velocity constriction mechanism are introduced into the algorithm. The feasibility and effectiveness of MOPSO-M are assessed in comparison with general MOPSO and nondominated sorting genetic algorithm-II (NSGA-II).