Project crashing in the presence of general non-linear activity time reduction costs (Q1758859)

From MaRDI portal





scientific article; zbMATH DE number 6108293
Language Label Description Also known as
default for all languages
No label defined
    English
    Project crashing in the presence of general non-linear activity time reduction costs
    scientific article; zbMATH DE number 6108293

      Statements

      Project crashing in the presence of general non-linear activity time reduction costs (English)
      0 references
      0 references
      0 references
      0 references
      16 November 2012
      0 references
      Summary: We are concerned with the project crashing problem. The functional form we consider for the crashing costs is a negative-exponential form of the amount of capital invested that captures most of the more realistic forms that have been proposed in the literature. We formulate a non-linear optimisation model of the resulting generalised crashing problem, and develop a convex geometric programming approximation of this model. The model can be readily extended to handle situations where it is desired to determine the minimum capital investment needed to crash activities so that the total project duration does not exceed a given time length. Numerical illustrations of the approach are provided.
      0 references
      project management
      0 references
      activity crashing
      0 references
      project time-cost analysis
      0 references
      geometric programming
      0 references