Method of fuzzy critical path for network planning and control over projects based on soft computations (Q1974324)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 1439551
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Method of fuzzy critical path for network planning and control over projects based on soft computations |
scientific article; zbMATH DE number 1439551 |
Statements
Method of fuzzy critical path for network planning and control over projects based on soft computations (English)
0 references
7 May 2000
0 references
The authors study the method of fuzzy critical path for network planning and control in projects based on soft computation. Their paper has the following parts: 1. Analysis of methods for solving problems of network planning and control based on fuzzy input data. 2. Basic ideas of the method of fuzzy critical path (FCPM). 3. A mathematical model of FCPM. 4. Algorithm and analysis of the results of the realization of the mathematical model of FCPM. 5. Evaluation of the effectiveness of a time schedule of a project. 6. A structure of the system of network planning and control for projects on the basis of FCPM. 7. An example of realization of a mathematical model of FCPM.
0 references
fuzzy critical path
0 references
network planning
0 references
soft computation
0 references
fuzzy input data
0 references
0.93532836
0 references
0.9116174
0 references
0.90889263
0 references
0.89476395
0 references
0.88883203
0 references
0.8867879
0 references
0.8814379
0 references
0.87598145
0 references