Analysis of pipe-roof in tunnel exiting portal by the foundation elastic model (Q1993315)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Analysis of pipe-roof in tunnel exiting portal by the foundation elastic model
scientific article

    Statements

    Analysis of pipe-roof in tunnel exiting portal by the foundation elastic model (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    5 November 2018
    0 references
    Summary: The Pasternak double-parameter elastic foundation model of pipe-roof during the construction of tunnel exits is first established. Based on the portal project of Hanjiashan highway tunnel, an inclinometer is adopted to measure the settlement deformation of a pipe-roof and demonstrates the deformation law in tunnel exiting portals. The formulas for calculating the deflection and internal forces are derived to analyze the deformation of the pipe-roof in each excavation stage, and the results are compared with field monitoring data. Finally, the influences of excavation height, excavation footage, and stiffness of the pipe-roof on the support effect are investigated. Analysis indicates that the longitudinal settlement curve shows a groove distribution, which can be divided into five stages: micro, rapid, continuous, resilience, and stable deformation. Moreover, the subsidence rate reaches its maximum at the tunnel face. The influence of tunnel excavation on the deformation mainly has a range of 1. 5 times the excavation height. To control the deflection of the pipe-roof, excavation height should be controlled in the range of 3.5 m, excavation footage should be controlled in the range of 1--1.4 m, and the diameter and thickness of the selected pipe-roof should be in the ranges of 89--159 mm and 5--8 mm, respectively.
    0 references
    0 references
    0 references