Analysis of a two-unit automatic power factor controller system with priority to inspection over repair/replacement (Q2224223)
From MaRDI portal
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Analysis of a two-unit automatic power factor controller system with priority to inspection over repair/replacement |
scientific article |
Statements
Analysis of a two-unit automatic power factor controller system with priority to inspection over repair/replacement (English)
0 references
3 February 2021
0 references
Summary: For the present paper, a reliability model of automatic power factor controller working in industrial companies has been developed using regenerative point technique. The system for the study consists of two cold standby identical units. Initially, the system is operative with controlled power factor. The inspection is carried out to detect the type of failure which can be due to fuse blown off, transformer burnt, programming problem, output relay faulty. But different type of failure requires different time to repair/replacement. Priority is given to repair/replacement based on estimated values of repair/replacement rates for different type of failure. Hence it is required to detect the type of failure as soon as possible which can be done by inspection only. In view of this, inspection is given priority over repair/replacement also. The various reliability indices of system effectiveness are obtained and graphs have been plotted for economic analysis of the system.
0 references
automatic power factor controller
0 references
APFC
0 references
controlled/uncontrolled power factor
0 references
reliability indices of system effectiveness
0 references
regenerative point technique
0 references
profit analysis
0 references
availability
0 references
mean time to system failure
0 references
MTSF
0 references