Optimisation on empty trains distribution with time window in heavy haul railway (Q2224289)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7305542
Language Label Description Also known as
default for all languages
No label defined
    English
    Optimisation on empty trains distribution with time window in heavy haul railway
    scientific article; zbMATH DE number 7305542

      Statements

      Optimisation on empty trains distribution with time window in heavy haul railway (English)
      0 references
      0 references
      0 references
      0 references
      0 references
      3 February 2021
      0 references
      Summary: The half close form of heavy haul railway such as Daqin railway is divided into two parts, i.e., the loading region and the unloading region, according to its characteristic. We research the whole process of empty trains distribution. To guarantee loading continuity and stability, a model is proposed to minimise the empty trains multiplying hours of arriving at loading point early or late and subject to the constraints of the required empty trains in loading point, transport capacity in unloading region, the time window of loading point and the type, mode and quantity of empty trains combined in combination station and decomposed in decomposition station. The aim is to improve the efficiency of empty trains returning and reduce the operating costs. The data from Daqin heavy haul railway are performed to testify the model's correctness and effectiveness.
      0 references
      heavy haul railway
      0 references
      empty wagons distribution
      0 references
      empty wagons combination
      0 references
      empty wagons decomposition
      0 references
      Daqin railway
      0 references

      Identifiers