Two parallel machines scheduling with two-vehicle job delivery to minimize makespan (Q2296256)

From MaRDI portal





scientific article; zbMATH DE number 7168518
Language Label Description Also known as
default for all languages
No label defined
    English
    Two parallel machines scheduling with two-vehicle job delivery to minimize makespan
    scientific article; zbMATH DE number 7168518

      Statements

      Two parallel machines scheduling with two-vehicle job delivery to minimize makespan (English)
      0 references
      0 references
      0 references
      0 references
      0 references
      18 February 2020
      0 references
      Summary: A problem of parallel machine scheduling with coordinated job deliveries is handled to minimize the makespan. Different jobs call for dissimilar sizes of storing space in the process of transportation. A range of jobs of one customer in the problem have priority to be processed on two identical parallel machines without preemption and then delivered to the customer by two vehicles in batches. For this NP-hard problem, we first prove that it is impossible to have a polynomial heuristic with a worst-case performance ratio bound less than 2 unless P = NP. Thereafter, we develop a polynomial heuristic for this problem, the worst-case ratio of which is bounded by 2.
      0 references

      Identifiers

      0 references
      0 references
      0 references
      0 references
      0 references
      0 references