Two parallel machines scheduling with two-vehicle job delivery to minimize makespan (Q2296256)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two parallel machines scheduling with two-vehicle job delivery to minimize makespan |
scientific article; zbMATH DE number 7168518
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Two parallel machines scheduling with two-vehicle job delivery to minimize makespan |
scientific article; zbMATH DE number 7168518 |
Statements
Two parallel machines scheduling with two-vehicle job delivery to minimize makespan (English)
0 references
18 February 2020
0 references
Summary: A problem of parallel machine scheduling with coordinated job deliveries is handled to minimize the makespan. Different jobs call for dissimilar sizes of storing space in the process of transportation. A range of jobs of one customer in the problem have priority to be processed on two identical parallel machines without preemption and then delivered to the customer by two vehicles in batches. For this NP-hard problem, we first prove that it is impossible to have a polynomial heuristic with a worst-case performance ratio bound less than 2 unless P = NP. Thereafter, we develop a polynomial heuristic for this problem, the worst-case ratio of which is bounded by 2.
0 references
0 references
0 references
0 references
0.92034495
0 references
0.9083349
0 references
0.89824283
0 references
0.89824086
0 references
0.8978328
0 references
0.8947447
0 references
0.89339584
0 references
0.8906092
0 references