Near-optimal heuristics for just-in-time jobs maximization in flow shop scheduling (Q2331444)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7123887
Language Label Description Also known as
default for all languages
No label defined
    English
    Near-optimal heuristics for just-in-time jobs maximization in flow shop scheduling
    scientific article; zbMATH DE number 7123887

      Statements

      Near-optimal heuristics for just-in-time jobs maximization in flow shop scheduling (English)
      0 references
      0 references
      0 references
      0 references
      29 October 2019
      0 references
      Summary: The number of just-in-time jobs maximization in a permutation flow shop scheduling problem is considered. A mixed integer linear programming model to represent the problem as well as solution approaches based on enumeration and constructive heuristics were proposed and computationally implemented. Instances with up to 10 jobs and five machines are solved by the mathematical model in an acceptable running time (3.3 min on average) while the enumeration method consumes, on average, 1.5 s. The 10 constructive heuristics proposed show they are practical especially for large-scale instances (up to 100 jobs and 20 machines), with very good-quality results and efficient running times. The best two heuristics obtain near-optimal solutions, with only 0.6\% and 0.8\% average relative deviations. They prove to be better than adaptations of the NEH heuristic (well-known for providing very good solutions for makespan minimization in flow shop) for the considered problem.
      0 references
      just-in-time scheduling
      0 references
      flow shop
      0 references
      heuristics
      0 references

      Identifiers

      0 references
      0 references
      0 references
      0 references
      0 references
      0 references
      0 references