Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops (Q2467262)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Single-job lot streaming in m - 1 two-stage hybrid flowshops |
scientific article; zbMATH DE number 5228744
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops |
scientific article; zbMATH DE number 5228744 |
Statements
Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops (English)
0 references
21 January 2008
0 references
scheduling
0 references
hybrid flowshop
0 references
setup times
0 references
optimal solution
0 references
heuristics
0 references
0 references
0 references
0 references
0.9332419037818908
0 references
0.8835219144821167
0 references
0.8685398101806641
0 references
0.867546021938324
0 references
0.855171799659729
0 references