Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop (Q330269)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 6643061
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop |
scientific article; zbMATH DE number 6643061 |
Statements
Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop (English)
0 references
25 October 2016
0 references
scheduling
0 references
lot streaming
0 references
hybrid flow shop
0 references
0 references
0 references
0.9332419037818908
0 references
0.8619992136955261
0 references
0.859683632850647
0 references
0.8586347699165344
0 references
0.857816755771637
0 references