Replenishment decisions under two-level credit policy for flexible credit linked demand (Q2627441)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Replenishment decisions under two-level credit policy for flexible credit linked demand
scientific article

    Statements

    Replenishment decisions under two-level credit policy for flexible credit linked demand (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    31 May 2017
    0 references
    Summary: Trade credit affects the conduct of business significantly for many reasons. For the supplier who offers trade credit, it is an effective means of price discrimination as well as efficient method to stimulate the demand of his products. Trade credit in the form of permissible delay in payments has direct influence on inventory as well as on the demand of an item. Unfortunately, the influence of credit period on demand has received very little attention in the literature, whereas in reality, length of the offered credit period has positive influence on the demand rate which may be instant or delayed. Hence, to consider the flexible influence of trade credit on the demand of an item, a discrete logistic credit linked demand function has been developed which takes care of both the instant as well as delayed impact of the credit period on the demand rate. Based on the EOQ model, this paper analyses the problem of the retailer who has to decide his trade credit period and cycle length simultaneously under the two levels of trade credit policy. An example is given to illustrate the theoretical results. Computational results provide some interesting policy implications.
    0 references
    0 references
    0 references
    0 references
    0 references
    inventory modelling
    0 references
    flexible demand
    0 references
    credit-linked demand
    0 references
    payment delays
    0 references
    two level credit policy
    0 references
    procurement policy
    0 references
    operational research
    0 references
    replenishment decisions
    0 references
    credit period
    0 references
    EOQ
    0 references
    economic order quantity
    0 references
    cycle length
    0 references
    0 references