Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment (Q2953474)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 6670394
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment |
scientific article; zbMATH DE number 6670394 |
Statements
Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment (English)
0 references
4 January 2017
0 references
lot sizing
0 references
fuzzy set theory
0 references
graded mean integration representation method
0 references
signed distance method
0 references
rework process
0 references
single-stage production system
0 references
0.8084174990653992
0 references
0.7920864820480347
0 references
0.7896485328674316
0 references
0.7857457399368286
0 references