Protective stocks in multi-stage production systems (Q3343748)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 3878655
Language Label Description Also known as
default for all languages
No label defined
    English
    Protective stocks in multi-stage production systems
    scientific article; zbMATH DE number 3878655

      Statements

      Protective stocks in multi-stage production systems (English)
      0 references
      0 references
      0 references
      0 references
      1984
      0 references
      multi-stage production systems
      0 references
      Uncertainty
      0 references
      material requirements planning
      0 references
      optimal decisions
      0 references
      heuristic
      0 references
      safety stock
      0 references
      safety time
      0 references
      Uncertainty in material requirements planning (MRP) systems does exist in several forms, variability in demand from period to period, uncertainty in the supply from stage to stage due to the variability in the yields from each production batch, and uncertainty in the lead times. The goals of the paper are to develop theoretical models for determining optimal decisions in this uncertain environment, to develop a computationally tractable heuristic and to examine how safety stock and safety time can arise. Finally, our methodology is compared with MRP practice.
      0 references

      Identifiers