Protective stocks in multi-stage production systems (Q3343748)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 3878655
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Protective stocks in multi-stage production systems |
scientific article; zbMATH DE number 3878655 |
Statements
Protective stocks in multi-stage production systems (English)
0 references
1984
0 references
multi-stage production systems
0 references
Uncertainty
0 references
material requirements planning
0 references
optimal decisions
0 references
heuristic
0 references
safety stock
0 references
safety time
0 references
0.8652732968330383
0 references
0.8558807969093323
0 references
0.8545863628387451
0 references
0.8020721077919006
0 references
0.7970942258834839
0 references
Uncertainty in material requirements planning (MRP) systems does exist in several forms, variability in demand from period to period, uncertainty in the supply from stage to stage due to the variability in the yields from each production batch, and uncertainty in the lead times. The goals of the paper are to develop theoretical models for determining optimal decisions in this uncertain environment, to develop a computationally tractable heuristic and to examine how safety stock and safety time can arise. Finally, our methodology is compared with MRP practice.
0 references