No label defined (Q3748048)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 3984950
Language Label Description Also known as
default for all languages
No label defined
    English
    No label defined
    scientific article; zbMATH DE number 3984950

      Statements

      0 references
      0 references
      1986
      0 references
      flow-shop problem
      0 references
      minimax penalty function
      0 references
      critical sequence
      0 references
      blocks of jobs
      0 references
      general bounding strategy
      0 references
      lower bounds
      0 references
      The principal aim of the paper is to present an algorithm for solving the flow-shop problem with the minimax penalty function and some of its properties. A solution to this problem is based on the concepts of critical sequence and blocks of jobs. A mathematical formulation of the problem is given. Basic properties of the problem considered that make the construction of an algorithm possible are discussed. An algorithm that enables one to determine the starting times for a given schedule of jobs is proposed. Moreover, a branch-and-bound type algorithm for determining the optimal schedule is presented. The principle of partitioning the subsets into a solution tree is formulated. The general bounding strategy and some lower bounds for the problem considered are determined. Some possibilities of extending the approach investigated to more general sequence problems are also analyzed.
      0 references

      Identifiers