No label defined (Q4373576)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 1107639
Language Label Description Also known as
default for all languages
No label defined
    English
    No label defined
    scientific article; zbMATH DE number 1107639

      Statements

      0 references
      0 references
      0 references
      23 June 1999
      0 references
      Kullback-Leibler information
      0 references
      chi-squared approximation
      0 references
      control limit
      0 references
      control chart
      0 references
      The \((\overline{x},s)\) control chart is a new type of control chart in which the states of the process are represented by a succession of points \((\overline{x},s)\) on a rectangular coordinate graph, where \(\overline{x}\) is the sample mean and \(s\) is the sample standard deviation with divisor \(n\). By using the \((\overline{x},s)\) control chart, a significant departure of the process from its null state may easily be seen. The main problem is how to specify the control limit of the \((\overline{x},s)\) control chart to give a specified probability of Type I error. In this paper, the difference between the null distribution and the estimated distribution in its present state is evaluated by means of Kullback-Leibler information. The asymptotic distribution of the Kullback-Leibler information statistic for the normal distribution is the chi-squared distribution with two degrees of freedom. However, the sample size used in the control chart is usually small, in which case the chi-squared distribution with two degrees of freedom is not appropriate. Instead we derive an alternative chi-squared approximation to the distribution of the Kullback-Leibler information statistics. We then use this distribution to develop a procedure for determining the control limit of the \((\overline{x},s)\) control chart taking into account the required probability of Type I error. The multiple decisions involved in detecting changes in the process are also discussed. For the entire collection see [Zbl 0867.00026].
      0 references

      Identifiers