A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria (Q4394375)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria |
scientific article; zbMATH DE number 1162814
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria |
scientific article; zbMATH DE number 1162814 |
Statements
A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria (English)
0 references
11 June 1998
0 references
flowshop
0 references
flowline-based manufacturing cell
0 references
heuristic
0 references
flowshop scheduling
0 references
0 references
0.8981279134750366
0 references
0.8630295991897583
0 references
0.8548166751861572
0 references
0.847525417804718
0 references
0.8440460562705994
0 references