Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2 (Q4245176)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 1297000
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2 |
scientific article; zbMATH DE number 1297000 |
Statements
Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2 (English)
0 references
8 June 1999
0 references
0.8908007144927979
0 references
0.8548166751861572
0 references
0.8219553828239441
0 references
0.8050691485404968
0 references
0.7979419231414795
0 references