Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2
From MaRDI portal
Publication:4245176
DOI10.1080/002075497196000zbMath0951.90547OpenAlexW2080334120MaRDI QIDQ4245176
Chandrasekharan Rajendran, B. Sharadapriyadarshini
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497196000
Related Items (3)
Optimal versus heuristic scheduling of surface mount technology lines ⋮ The cycle time distribution ⋮ Heuristic for scheduling in a Kanban system with dual blocking mechanisms
This page was built for publication: Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2