New elevator group-control method for up-peak periods (Q4456048)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 2059492
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | New elevator group-control method for up-peak periods |
scientific article; zbMATH DE number 2059492 |
Statements
New elevator group-control method for up-peak periods (English)
0 references
17 March 2004
0 references
simulation
0 references
heuristics
0 references
allocation
0 references
controlling multiple elevator cars
0 references
traffic efficiency
0 references
0.8124685883522034
0 references
0.7591190934181213
0 references
0.758629560470581
0 references
0.7580819725990295
0 references
0.744784951210022
0 references
An elevator group-control system controlling multiple elevator cars to improve traffic efficiency in buildings is considered. The paper presents a heuristic control method for up-peak periods such as the morning peak in office buildings. This method allocates an appropriate number of elevator cars to the lobby floor where the demand is highest in up-peak periods. To determine the optimal car allocation number, the relative demand at the lobby versus the upper floors is used as a basic input feature. The results of simulations are included to verify the effectiveness of the proposed method.
0 references