No label defined (Q4697340)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 221974
Language Label Description Also known as
default for all languages
No label defined
    English
    No label defined
    scientific article; zbMATH DE number 221974

      Statements

      0 references
      29 June 1993
      0 references
      statistical process control
      0 references
      finite lot of items
      0 references
      economic approach
      0 references
      technical approach
      0 references
      algorithms
      0 references
      optimal control policies
      0 references
      screening procedures
      0 references
      expected process time
      0 references
      expected number of inspections and renewals
      0 references
      Mathematical models developed in the context of statistical process control have been focused on the problem ``when and how often'' sampling actions should be performed. For controlling the production of a finite lot of items two different approaches are considered: the well-known economic approach, and a novel technical approach. For both cases algorithms are derived for determining approximately optimal control policies for sampling as well as for screening procedures. In the economic case usually ``profit'' is maximized and in the non-economic case ``run-length'' with respect to in and out of control states of the process are optimized. This paper presents an economic objective function and a purely ``technical'' objective function defined as ``expected number of conforming items per hour''. Inspections and renewals can improve the quality of a production process but are time consuming. Hence there is an impact of quality and the time the process needs to produce a fixed quantity of items. In order to describe this interdependence a process control model assuming an infinitely operating process is modified to include a finite operating time. Optimal inspection schedules are determined, and formulas for the expected process time and the expected number of inspections and renewals are presented.
      0 references

      Identifiers