No label defined (Q4697340)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 221974
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | No label defined |
scientific article; zbMATH DE number 221974 |
Statements
29 June 1993
0 references
statistical process control
0 references
finite lot of items
0 references
economic approach
0 references
technical approach
0 references
algorithms
0 references
optimal control policies
0 references
screening procedures
0 references
expected process time
0 references
expected number of inspections and renewals
0 references
0.8554670214653015
0 references
0.82716304063797
0 references
0.8226295113563538
0 references
Mathematical models developed in the context of statistical process control have been focused on the problem ``when and how often'' sampling actions should be performed. For controlling the production of a finite lot of items two different approaches are considered: the well-known economic approach, and a novel technical approach. For both cases algorithms are derived for determining approximately optimal control policies for sampling as well as for screening procedures. In the economic case usually ``profit'' is maximized and in the non-economic case ``run-length'' with respect to in and out of control states of the process are optimized. This paper presents an economic objective function and a purely ``technical'' objective function defined as ``expected number of conforming items per hour''. Inspections and renewals can improve the quality of a production process but are time consuming. Hence there is an impact of quality and the time the process needs to produce a fixed quantity of items. In order to describe this interdependence a process control model assuming an infinitely operating process is modified to include a finite operating time. Optimal inspection schedules are determined, and formulas for the expected process time and the expected number of inspections and renewals are presented.
0 references