The supplying chain scheduling with the cost constraint and subcontracting (Q471714)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 6370022
Language Label Description Also known as
default for all languages
No label defined
    English
    The supplying chain scheduling with the cost constraint and subcontracting
    scientific article; zbMATH DE number 6370022

      Statements

      The supplying chain scheduling with the cost constraint and subcontracting (English)
      0 references
      0 references
      0 references
      17 November 2014
      0 references
      Summary: We propose an analytical scheduling model with subcontracting. Each job can be processed either on a single machine at a manufacturer or outsourced to a subcontractor, possibly at a higher cost. For a given set of jobs, the decisions the manufacturer needs to make include the selection of a subset of jobs to be outsourced and the schedule of all the jobs. The objective functions are to minimize the commonly used scheduling measures, subject to a constraint on the total production and subcontracting cost. We show the NP-hardiness for the problems with different objective functions and develop dynamic programming algorithms for solving them.
      0 references

      Identifiers