Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers (Q554642)

From MaRDI portal





scientific article; zbMATH DE number 5936129
Language Label Description Also known as
default for all languages
No label defined
    English
    Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers
    scientific article; zbMATH DE number 5936129

      Statements

      Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers (English)
      0 references
      0 references
      0 references
      4 August 2011
      0 references
      Summary: A two-level supply chain situation is considered. A manufacturer/vendor is assumed to receive raw material parts from a number of suppliers for assembling a single product. The parts obtained from the supplier are not of a perfect quality. That is, each supplier may have an approximately fixed percentage of defectives in the lots supplied. An inspection process is carried out at the vendor's end to take out these imperfect parts while manufacturing the product. A different percentage of defectives from each supplier gives rise to some unused parts left with the vendor in each cycle. These parts are utilised in the next cycle. Different coordination mechanisms for controlling the supply chain inventory are studied. A cost minimisation model is given for each. A numerical example is given to compare the coordination mechanisms.
      0 references
      EPQ
      0 references
      EMQ
      0 references
      imperfect quality
      0 references
      supply chain coordination
      0 references
      learning curve
      0 references

      Identifiers