Research on construction and application for the model of multistage job shop scheduling problem (Q782293)

From MaRDI portal





scientific article; zbMATH DE number 7224386
Language Label Description Also known as
default for all languages
No label defined
    English
    Research on construction and application for the model of multistage job shop scheduling problem
    scientific article; zbMATH DE number 7224386

      Statements

      Research on construction and application for the model of multistage job shop scheduling problem (English)
      0 references
      0 references
      0 references
      0 references
      23 July 2020
      0 references
      Summary: Based on the practical application of an enterprise, we address the multistage job shop scheduling problem with several parallel machines in the first stage (production), a few parallel machines in the second stage (processing and assembly), and one machine in the following stages (including joint debugging, testing, inspection, and packaging). First, we establish the optimization objective model for the first two stages. Then, based on the design of the sequencing algorithm in the first two stages, a correction algorithm is designed between the first stage and the second stage to solve this problem systematically. Finally, we propose two benchmark approaches to verify the performance of our proposed algorithm. Verification of numerical experiments shows that the model and algorithm constructed in this paper effectively improve the production efficiency of the enterprise.
      0 references

      Identifiers