Scheduling independent 2-processor tasks to minimize schedule length (Q796987)

From MaRDI portal





scientific article; zbMATH DE number 3866579
Language Label Description Also known as
default for all languages
No label defined
    English
    Scheduling independent 2-processor tasks to minimize schedule length
    scientific article; zbMATH DE number 3866579

      Statements

      Scheduling independent 2-processor tasks to minimize schedule length (English)
      0 references
      0 references
      0 references
      0 references
      1984
      0 references
      The problem considered in this paper is the deterministic scheduling of tasks on a set of identical processors. However, the model presented differs from the classical one by the requirement that certain tasks need more than one processor at a time for their processing. In the paper an O(n log n) algorithm is given for scheduling n preemtable tasks on m processors to minimize schedule length, when tasks are divided into two subsets. Each task from the first subset requires one processor at a time, and each task from the second subset requires two processors at a time for its processing.
      0 references
      multiprocessor tasks
      0 references
      polynomial-time algorithm
      0 references
      deterministic scheduling
      0 references
      identical processors
      0 references

      Identifiers