| Publication | Date of Publication | Type |
|---|
Measuring the slack between lower bounds for scheduling on parallel machines Annals of Operations Research | 2024-08-15 | Paper |
Algorithms to compute the energetic lower bounds of the cumulative scheduling problem Annals of Operations Research | 2024-07-30 | Paper |
| Distributed rerouting in DCS mesh networks | 2024-07-05 | Paper |
A data structure for efficiently managing a set of energy functions Journal of Combinatorial Optimization | 2022-10-18 | Paper |
Polynomial algorithms for some scheduling problems with one nonrenewable resource RAIRO - Operations Research | 2022-02-21 | Paper |
An \(O(n^2)\) algorithm for time-bound adjustments for the cumulative scheduling problem European Journal of Operational Research | 2020-05-27 | Paper |
Lower bounds for the event scheduling problem with consumption and production of resources Discrete Applied Mathematics | 2017-12-20 | Paper |
The robust binomial approach to chance-constrained optimization problems with application to stochastic partitioning of large process networks Journal of Heuristics | 2017-04-04 | Paper |
The data transfer problem in a system of systems European Journal of Operational Research | 2016-10-06 | Paper |
A GRASP metaheuristic for the robust mapping and routing of dataflow process networks on manycore architectures 4OR | 2015-09-17 | Paper |
A preemptive bound for the resource constrained project scheduling problem Journal of Scheduling | 2014-08-18 | Paper |
| Exact method for robotic cell problem | 2013-11-08 | Paper |
Integer preemptive scheduling on parallel machines Operations Research Letters | 2013-03-05 | Paper |
Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage Computers & Operations Research | 2012-11-15 | Paper |
Dominance rules in combinatorial optimization problems European Journal of Operational Research | 2012-05-14 | Paper |
New data-dependent dual-feasible functions and lower bounds for a two-dimensional bin-packing problem International Journal of Production Research | 2012-02-04 | Paper |
Exact methods for the robotic cell problem Flexible Services and Manufacturing Journal | 2012-01-26 | Paper |
Task ordering and memory management problem for degree of parallelism estimation Lecture Notes in Computer Science | 2011-08-17 | Paper |
Properties of optimal schedules in preemptive shop scheduling Discrete Applied Mathematics | 2011-03-10 | Paper |
The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm Discrete Applied Mathematics | 2010-04-28 | Paper |
An optimization-based heuristic for the robotic cell problem European Journal of Operational Research | 2009-11-27 | Paper |
Integrality Property in Preemptive Parallel Machine Scheduling Computer Science - Theory and Applications | 2009-08-18 | Paper |
Approximate solution of a resource-constrained scheduling problem Journal of Heuristics | 2009-03-31 | Paper |
A new exact method for the two-dimensional bin-packing problem with fixed orientation Operations Research Letters | 2008-01-21 | Paper |
A new constraint programming approach for the orthogonal packing problem Computers & Operations Research | 2007-10-19 | Paper |
Dominance-based heuristics for one-machine total cost scheduling problems European Journal of Operational Research | 2007-10-10 | Paper |
A new exact method for the two-dimensional orthogonal packing problem European Journal of Operational Research | 2007-08-27 | Paper |
On a resource-constrained scheduling problem with application to distributed systems reconfiguration European Journal of Operational Research | 2007-07-04 | Paper |
New reduction procedures and lower bounds for the two-dimensional bin packing problem with fixed orientation Computers & Operations Research | 2007-02-26 | Paper |
Computing redundant resources for the resource constrained project scheduling problem European Journal of Operational Research | 2006-11-15 | Paper |
Heuristic and metaheuristic methods for computing graph treewidth RAIRO - Operations Research | 2006-07-11 | Paper |
Heuristic and metaheuristic methods for computing graph treewidth RAIRO - Operations Research | 2006-07-11 | Paper |
Heuristic and metaheuristic methods for computing graph treewidth RAIRO - Operations Research | 2006-07-11 | Paper |
Jackson's pseudo-preemptive schedule and cumulative scheduling problems Discrete Applied Mathematics | 2005-01-31 | Paper |
A branch-and-bound procedure to minimize total tardiness on one machine with arbitrary release dates European Journal of Operational Research | 2004-08-10 | Paper |
| scientific article; zbMATH DE number 1982177 (Why is no real title available?) | 2003-09-16 | Paper |
On linear lower bounds for the resource constrained project scheduling problem. European Journal of Operational Research | 2003-07-30 | Paper |
Improving the finite element ordering for the frontal solver Revue Européenne des Éléments Finis | 2002-02-12 | Paper |
Evaluating network reliability and 2-edge-connected reliability in linear time for bounded pathwidth graphs Algorithmica | 2001-01-11 | Paper |
A new LP-based lower bound for the cumulative scheduling problem European Journal of Operational Research | 2000-12-19 | Paper |
An Exact Method for Solving the Multi-Processor Flow-Shop RAIRO - Operations Research | 2000-08-24 | Paper |
An Exact Method for Solving the Multi-Processor Flow-Shop RAIRO - Operations Research | 2000-08-24 | Paper |
Assigning spare capacities in mesh survivable networks Telecommunication Systems | 2000-01-01 | Paper |
An exact method for minimizing the makespan of an application processed on a master slave bus oriented multiprocessor system Discrete Applied Mathematics | 1999-06-28 | Paper |
Jackson's pseudo preemptive schedule for the \(Pm/r_i, q_i/C_{\text{max}}\) scheduling problem Annals of Operations Research | 1998-12-06 | Paper |
Two branch and bound algorithms for the permutation flow shop problem European Journal of Operational Research | 1998-11-29 | Paper |
| scientific article; zbMATH DE number 1059311 (Why is no real title available?) | 1998-04-22 | Paper |
Reliability evaluation of large telecommunication networks Discrete Applied Mathematics | 1998-02-24 | Paper |
Décomposition d'une application sur une architecture bus : propriétés des ordonnancements optimaux RAIRO - Operations Research | 1997-12-17 | Paper |
| scientific article; zbMATH DE number 956858 (Why is no real title available?) | 1997-06-09 | Paper |
A decomposition algorithm for network reliability evaluation Discrete Applied Mathematics | 1996-10-24 | Paper |
Adjustment of heads and tails for the job-shop problem European Journal of Operational Research | 1995-01-11 | Paper |
| scientific article; zbMATH DE number 686978 (Why is no real title available?) | 1994-11-10 | Paper |
Une méthode arborescente pour résoudre les problèmes cumulatifs RAIRO - Operations Research | 1991-01-01 | Paper |
Probabilistic approach to the satisfiability problem Theoretical Computer Science | 1991-01-01 | Paper |
Factoring and reductions for networks with imperfect vertices IEEE Transactions on Reliability | 1991-01-01 | Paper |
A practical use of Jackson's preemptive schedule for solving the job shop problem Annals of Operations Research | 1990-01-01 | Paper |
An Algorithm for Solving the Job-Shop Problem Management Science | 1989-01-01 | Paper |
| scientific article; zbMATH DE number 4092766 (Why is no real title available?) | 1988-01-01 | Paper |
Scheduling jobs with release dates and tails on identical machines to minimize the makespan European Journal of Operational Research | 1987-01-01 | Paper |
| scientific article; zbMATH DE number 3954272 (Why is no real title available?) | 1986-01-01 | Paper |
| scientific article; zbMATH DE number 3896317 (Why is no real title available?) | 1985-01-01 | Paper |
The one-machine sequencing problem European Journal of Operational Research | 1982-01-01 | Paper |
Un domaine très ouvert : les problèmes d'ordonnancement RAIRO - Operations Research | 1982-01-01 | Paper |
Ordonnancements à contraintes disjonctives RAIRO - Operations Research | 1978-01-01 | Paper |
| scientific article; zbMATH DE number 3531181 (Why is no real title available?) | 1975-01-01 | Paper |