The one-machine sequencing problem
From MaRDI portal
Cites work
- scientific article; zbMATH DE number 3604658 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 3378735 (Why is no real title available?)
- Minimizing maximum lateness on one machine: computational experience and some applications
- On sequencing with earliest starts and due dates with application to computing bounds for the (n/m/G/Fmax) problem
- Sequencing with due-dates and early start times to minimize maximum tardiness
Cited in
(only showing first 100 items - show all)- Depth-first heuristic search for the job shop scheduling problem
- A robust approach for the single machine scheduling problem
- Deterministic job-shop scheduling: Past, present and future
- Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
- A branch and bound algorithm for scheduling trains in a railway network
- Two branch and bound algorithms for the permutation flow shop problem
- A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags
- Preemptive scheduling with release dates, delivery times and sequence independent setup times
- A job-shop problem with one additional resource type
- Using short-term memory to minimize the weighted number of late jobs on a single machine.
- Decomposition methods for reentrant flow shops with sequence-dependent setup times
- Minimizing makespan on parallel machines subject to release dates and delivery times
- Scheduling jobs on a single machine with release dates, delivery times and controllable processing times: Worst-case analysis
- An exact method for the bi-objective one-machine problem with maximum lateness and unit family setup cost objectives
- Evolution based learning in a job shop scheduling environment
- An improved branch-and-bound algorithm for the one-machine scheduling problem with delayed precedence constraints
- Developing feasible and optimal schedules of jobs on one machine
- Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage
- Competitive two-agent scheduling with release dates and preemption on a single machine
- An approximation algorithm for a single-machine scheduling problem with release times and delivery times
- Application of an optimization problem in max-plus algebra to scheduling problems
- A branch \(\&\) bound algorithm for the open-shop problem
- Scheduling jobs on parallel machines to minimize a regular step total cost function
- Branch and bound methods for scheduling problems with multiprocessor tasks on dedicated processors
- An \(O(n^2)\) algorithm for time-bound adjustments for the cumulative scheduling problem
- An exact approach for the 0-1 knapsack problem with setups
- Branch-and-bound algorithms for solving hard instances of the one-machine sequencing problem
- Job-shop scheduling with blocking and no-wait constraints
- Single machine scheduling to minimize maximum lateness subject to release dates and precedence constraints
- Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan
- Constraint propagation techniques for the disjunctive scheduling problem
- Polynomially solvable subcases for the approximate solution of multi-machine scheduling problems
- An exact block algorithm for no-idle RPQ problem
- A note on minimizing maximum lateness in a one-machine sequencing problem with release dates
- A block approach for single-machine scheduling with release dates and due dates
- An approximate decomposition algorithm for scheduling on parallel machines with heads and tails
- Minimizing maximum delivery completion time for order scheduling with rejection
- Scheduling with tails and deadlines
- An O\((n^4)\) algorithm for preemptive scheduling of a single machine to minimize the number of late jobs
- Concurrent operations can be parallelized in scheduling multiprocessor job shop
- Minimizing flow time in cyclic schedules for identical jobs with acyclic precedence: The bottleneck lower bound.
- Complexity, bounds and dynamic programming algorithms for single track train scheduling
- Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
- Improving branch and bound for jobshop scheduling with constraint propagation
- Permutation-induced acyclic networks for the job shop scheduling problem
- Scheduling a single machine with primary and secondary objectives
- An efficient ILP formulation for the single machine scheduling problem
- Constraint programming and operations research
- A branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates
- Scheduling batch processing machines with incompatible job families
- The generalized shifting bottleneck procedure
- Local adjustments: A general algorithm
- Approximation algorithms for scheduling real-time jobs with multiple feasible intervals
- \texttt{Absalom}: balancing assembly lines with assignment restrictions
- A branch and bound to minimize the number of late jobs on a single machine with release time constraints
- Scheduling in manufacturing with transportation: classification and solution techniques
- Scheduling Algorithms for Single Machine Problem with Release and Delivery Times
- Fast algorithms to minimize the makespan or maximum lateness in the two-machine flow shop with release times.
- Scheduling jobs with release dates and tails on identical machines to minimize the makespan
- The job-shop problem and immediate selection
- A sequencing problem with family setup times
- An algorithm for single machine sequencing with release dates to minimize maximum cost
- A modified shifting bottleneck procedure for job-shop scheduling
- Jackson's semi-preemptive scheduling on a single machine
- A novel MILP model for \(N\)-vehicle exploration problem
- Event-based MILP models for resource-constrained project scheduling problems
- A branch-and-bound method for the single-machine scheduling problem under a non-availability constraint for maximum delivery time minimization
- Scheduling Equal-Length Jobs with Delivery times on Identical Processors
- Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem
- Extending the single machine-based relaxation scheme for the job shop scheduling problem
- Scheduling with release dates on a single machine to minimize total weighted completion time
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem
- A time indexed formulation of non-preemptive single machine scheduling problems
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines
- scientific article; zbMATH DE number 1271322 (Why is no real title available?)
- A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags
- Adjustment of heads and tails for the job-shop problem
- Time lag size in multiple operations flow shop scheduling heuristics
- \textit{Branch} \& \textit{memorize} exact algorithms for sequencing problems: efficient embedding of memorization into search trees
- A branch-and-check algorithm for minimizing the weighted number of late jobs on a single machine with release dates
- Reduction of job-shop problems to flow-shop problems with precedence constraints
- A metric approach for scheduling problems with minimizing the maximum penalty
- A decomposition approach for a resource constrained scheduling problem
- SALSA: combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing
- Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties
- On the representation of the one machine sequencing problem in the shifting bottleneck heuristic
- Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability interval
- Applying machine based decomposition in 2-machine flow shops
- New single machine and job-shop scheduling problems with availability constraints
- Efficiency of reductions of job-shop to flow-shop problems
- Improving the preemptive bound for the single machine dynamic maximum lateness problem
- Measures of subproblem criticality in decomposition algorithms for shop scheduling
- Efficient approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval
- A tabu search method guided by shifting bottleneck for the job shop scheduling problem
- Core instances for testing: a case study
- A cutting plane approach for integrated planning and scheduling
- One-machine rescheduling heuristics with efficiency and stability as criteria
- Resource-constrained project scheduling: Notation, classification, models, and methods
- An exact approach for single machine subproblems in shifting bottleneck procedures for job shops with total weighted tardiness objective
- A branch and bound algorithm for the job-shop scheduling problem
This page was built for publication: The one-machine sequencing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1162927)