A branch-and-check algorithm for minimizing the weighted number of late jobs on a single machine with release dates
DOI10.1016/J.EJOR.2006.06.078zbMATH Open1144.90010OpenAlexW2089846192MaRDI QIDQ2482800FDOQ2482800
Authors: Ruslan Sadykov
Publication date: 24 April 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.078
Recommendations
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems
- A branch and bound to minimize the number of late jobs on a single machine with release time constraints
- Minimizing the weighted number of tardy jobs on a single machine with release dates
- Minimizing the weighted number of tardy jobs on a single machine
- A new branch and bound algorithm for minimizing the weighted number of tardy jobs
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Integer programming (90C10)
Cites Work
- Partitioning procedures for solving mixed-variables programming problems
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- Logic-based Benders decomposition
- Generalized Benders decomposition
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- Title not available (Why is that?)
- Title not available (Why is that?)
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Logic, optimization, and constraint programming
- The one-machine sequencing problem
- Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case
- Detecting infeasibility and generating cuts for mixed integer programming using constraint programming
- Integer programming and constraint programming in solving a multimachine assignment scheduling problem with deadlines and release dates
- Using short-term memory to minimize the weighted number of late jobs on a single machine.
- Algorithms for hybrid MILP/CP models for a class of optimization problems
- Title not available (Why is that?)
- Knapsack-like scheduling problems, the Moore-Hodgson algorithm and the `Tower of Sets' property
- Genetic algorithms to minimize the weighted number of late jobs on a single machine.
- A branch and bound to minimize the number of late jobs on a single machine with release time constraints
- Title not available (Why is that?)
- A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times
- Using Lagrangean relaxation to minimize the weighted number of late jobs on a single machine
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems
- Title not available (Why is that?)
Cited In (13)
- Propagating logic-based Benders' decomposition approaches for distributed operating room scheduling
- A branch and bound to minimize the number of late jobs on a single machine with release time constraints
- Branch-and-check approaches for the tourist trip design problem with rich constraints
- Branch less, cut more and minimize the number of late equal-length jobs on identical machines
- Branch-relax-and-check: a tractable decomposition method for order acceptance and identical parallel machine scheduling
- A branch-and-check approach for a wind turbine maintenance scheduling problem
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems
- Computational evaluation of cut-strengthening techniques in logic-based Benders' decomposition
- A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints
- A survey of single machine scheduling to minimize weighted number of tardy jobs
- A hybrid meta-heuristic algorithm to minimize the number of tardy jobs in a dynamic two-machine flow shop problem
- A two-stage robust approach for minimizing the weighted number of tardy jobs with objective uncertainty
- Logic-based Benders decomposition for large-scale optimization
Uses Software
This page was built for publication: A branch-and-check algorithm for minimizing the weighted number of late jobs on a single machine with release dates
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2482800)