Lot Streaming in Job-Shop Scheduling
From MaRDI portal
Recommendations
Cited in
(18)- An integrated tabu search algorithm for the lot streaming problem in job shops
- Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups
- Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
- Flow shop scheduling with lot streaming
- Integer programming approach to production scheduling for make-to-order manufacturing
- Lot streaming for quality control in two-stage batch production
- Lot streaming multiple jobs in a flow shop
- Multicriteria models for just-in-time scheduling
- The application of genetic algorithms to lot streaming in a job-shop scheduling problem
- Basic Techniques for Lot Streaming
- Lot streaming in open shop
- An extensive tabu search algorithm for solving the lot streaming problem in a job shop environment
- Lot streaming in a multiple product permutation flow shop with intermingling
- Lot streaming with variable sublots: an integer programming formulation
- Hierarchical approach to production scheduling in make-to-order assembly
- Discrete Lot Streaming In Two-Machine Flow Shops
- Heuristics for determining economic processing rates in a flexible manufacturing system
- Queueing network analysis on dynamic lot streaming
This page was built for publication: Lot Streaming in Job-Shop Scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4363760)