Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops
From MaRDI portal
Recommendations
- A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness
- On the complexity of preemptive open-shop scheduling problems
- The complexity of shop-scheduling problems with two or three jobs
- A Note On The Complexity Of Openshop Scheduling Problems
- Two-machine flow-shop scheduling problems with minimizing the total completion times
Cited in
(27)- On the complexity of preemptive open-shop scheduling problems
- The complexity of shop-scheduling problems with two or three jobs
- The two-machine total completion time flow shop problem
- Two-machine shop scheduling with zero and unit processing times
- On the complexity of preemptive openshop scheduling problems
- Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
- Scheduling two-machine preemptive open shops to minimize total completion time
- Complexity of mixed shop scheduling problems: A survey
- Simulated annealing and genetic algorithms for minimizing mean flow time in an open shop
- scientific article; zbMATH DE number 4131935 (Why is no real title available?)
- Integrality Property in Preemptive Parallel Machine Scheduling
- Some properties of the total flow-time problem of two machine open-shop
- scientific article; zbMATH DE number 4074798 (Why is no real title available?)
- The open shop scheduling problem with a given sequence of jobs on one machine
- Mean Flow Time Minimization in Reentrant Job Shops with a Hub
- An NP-Hard Open Shop Scheduling Problem with Polynomial Average Time Complexity
- Two-machine flow-shop scheduling problems with minimizing the total completion times
- Minimizing the Makespan and Flowtime in Two-Machine Stochastic Open Shops
- A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
- Bounding the running time of algorithms for scheduling and packing problems
- On the complexity of open shop scheduling with time lags
- Properties of optimal schedules in preemptive shop scheduling
- On the open-shop problem with preemption and minimizing the average completion time
- Open shops with jobs overlap -- revisited
- The bipartite margin shop and maximum red matchings free of blue-red alternating cycles
- The complexity of mean flow time scheduling problems with release times
- Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms
This page was built for publication: Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4033755)