Non-determinism and Probabilities in Timed Concurrent Constraint Programming
From MaRDI portal
Semantics in the theory of computing (68Q55) Specification and verification (program logics, model checking, etc.) (68Q60) Models and methods for concurrent and distributed computing (process algebras, bisimulation, transition nets, etc.) (68Q85) Probability in computer science (algorithm analysis, random structures, phase transitions, etc.) (68Q87)
Recommendations
- Probabilistic concurrent constraint programming
- Stochastic Behavior and Explicit Discrete Time in Concurrent Constraint Programming
- Probability and Nondeterminism in Operational Models of Concurrency
- A symbolic model for timed concurrent constraint programming
- Probabilistic and prioritized models of timed CSP
Cites work
- A logic for reasoning about time and reliability
- scientific article; zbMATH DE number 1809625 (Why is no real title available?)
- scientific article; zbMATH DE number 683349 (Why is no real title available?)
- scientific article; zbMATH DE number 1512615 (Why is no real title available?)
- scientific article; zbMATH DE number 1444329 (Why is no real title available?)
- Modeling concurrent systems specified in a temporal concurrent constraint language. I
- Probabilistic and nondeterministic aspects of anonymity
- Timed concurrent constraint programming for analysing biological systems
- Truly concurrent constraint programming
Cited in
(10)- Models and emerging trends of concurrent constraint programming
- A general overview of formal languages for individual-based modelling of ecosystems
- Denotational semantics for a probabilistic timed shared-variable language
- scientific article; zbMATH DE number 1444329 (Why is no real title available?)
- Mean-field semantics for a process calculus for spatially-explicit ecological models
- Stochastic Behavior and Explicit Discrete Time in Concurrent Constraint Programming
- Probability and Nondeterminism in Operational Models of Concurrency
- Probabilistic concurrent constraint programming
- Linking operational semantics and algebraic semantics for a probabilistic timed shared-variable language
- Probabilistic and prioritized models of timed CSP
This page was built for publication: Non-determinism and Probabilities in Timed Concurrent Constraint Programming
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5504690)