On Server Allocation in Multiple Center Manufacturing Systems
From MaRDI portal
Recommendations
- On the Optimal Allocation of Servers and Workloads in Closed Queueing Networks
- Machine allocation problems in manufacturing networks
- Optimal Server Allocation in a System of Multi-Server Stations
- Optimal server allocation in general, finite, multi-server queueing networks
- Optimal Workload Allocation in Open Networks of Multiserver Queues
Cited in
(17)- Capacity allocation in generalized Jackson networks
- Qeueing models for performance analysis: Selection of single station models
- Design of manufacturing systems using queueing models
- Machine allocation problems in manufacturing networks
- Modeling and analysis of machine sharing in manufacturing systems
- Traffic allocation for manufacturing systems
- Optimal design of a multiservice system: The line-penalty problem
- Server allocation subject to variance constraints
- The Optimal Input Rates To A System Of Manufacturing Cells
- Optimal Server Acquisition in Open Queueing Networks
- Optimal Lead Times and Service Rates in a Multiservice System with Bounded Resources
- Optimal server assignment for a multiple customer classes problem
- Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm
- A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach
- Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine tool selection and operation allocation problem in a flexible manufacturing system
- System planning and configuration problems for optimal system design
- Allocation of jobs and identical resources with two pooling centers
This page was built for publication: On Server Allocation in Multiple Center Manufacturing Systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3789317)