Optimal operation of multireservoir power systems
From MaRDI portal
The optimal monthly operating policy of a multireservoir hydroelectric power system is a stochastic nonlinear problem. This paper presents a new method for determining the optimal monthly operating policy of a power system of n reservoirs in series on a river taking into account the stochasticity of the river flows. Functional optimization techniques and minimum-norm formulation have been used to find the optimal release policy of the system. Results for a numerical example composed of four reservoirs are presented.
Recommendations
- Long-term optimal operation of a parallel multireservoir power system
- Optimization of reservoirs in series on a river with a nonlinear storage curve for long-term regulation
- Minimum norm approach to optimal long-term operation of multireservoir power systems with specified monthly generation
- scientific article; zbMATH DE number 4085408
- Controlling multi-reservoir systems.
Cites work
Cited in
(18)- Long-term optimal operation of a parallel multireservoir power system
- Modelling and optimization of reservoirs for long-term regulation with variable head using functional analysis
- Optimal long-term operation of a multi-reservoir power system for critical water conditions
- Modelling and optimization of parallel reservoirs having nonlinear storage curves under critical water conditions for long-term regulation
- Optimization of the production of hydroelectric power systems with a variable head
- Minimum norm approach to optimal long-term operation of multireservoir power systems with specified monthly generation
- Optimization of hydropower systems operation with a quadratic model
- A reservoir hydroelectric system: Exactly and approximately optimal policies
- Optimal long-term operation of electric power systems
- Stochastic differential dynamic programming for multi-reservoir system control
- Long-term optimal operation of series parallel reservoirs for critical period with specified monthly generation and average monthly storage
- Cost-benefit analysis and MILP for optimal reserve capacity determination in power system
- Stochastic optimization for hydro-thermal power systems
- scientific article; zbMATH DE number 4085408 (Why is no real title available?)
- Maximizing Power-System Loadability in the Presence of Multiple Binding Complementarity Constraints
- scientific article; zbMATH DE number 5204743 (Why is no real title available?)
- Optimization of reservoirs in series on a river with a nonlinear storage curve for long-term regulation
- Controlling multi-reservoir systems.
This page was built for publication: Optimal operation of multireservoir power systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1060998)