Optimal scheduling of batch industrial facilities
From MaRDI portal
Recommendations
- Automatic generation of production scheduling models in single stage multi-product batch plants: some examples
- An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates
- An MILP model for planning of batch plants operating in a campaign-mode
- scientific article; zbMATH DE number 2154255
- A mixed integer linear programming model for simultaneous design and scheduling of flowshop plants
Cited in
(13)- Optimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plant
- Scheduling of industrial distribution manifolds with pre-conditions
- An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies
- Automatic generation of production scheduling models in single stage multi-product batch plants: some examples
- A complex time based construction heuristic for batch scheduling problems in the chemical industry
- scientific article; zbMATH DE number 4016584 (Why is no real title available?)
- An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates
- Scheduling multi-purpose batch plants with junction constraints
- scientific article; zbMATH DE number 1786162 (Why is no real title available?)
- scientific article; zbMATH DE number 2159149 (Why is no real title available?)
- scientific article; zbMATH DE number 5494075 (Why is no real title available?)
- scientific article; zbMATH DE number 5049922 (Why is no real title available?)
- A disjunctive model for scheduling in a manufacturing and packing facility with intermediate storage
This page was built for publication: Optimal scheduling of batch industrial facilities
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4661122)