Scheduling multi-purpose batch plants with junction constraints
From MaRDI portal
Recommendations
- Short-term scheduling formulation with decomposition structure for multi-purpose batch plants
- Planning and scheduling of multistage multiproduct batch plants operating under production campaigns
- Batching and scheduling in a multi-machine flow shop
- Multi-objective scheduling for multi-product batch process with no-wait constraint
- Optimal scheduling of batch industrial facilities
- Scheduling of multistage fast-moving consumer goods plants
- scientific article; zbMATH DE number 7722
- Multi-objective multi-factory scheduling
- An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates
Cites work
Cited in
(14)- Optimal allocation of intermediate storage in multiproduct batch chemical plants
- Scheduling job shops with batch machines using the Lagrangian relaxation technique
- Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
- Scheduling of industrial distribution manifolds with pre-conditions
- scientific article; zbMATH DE number 1688602 (Why is no real title available?)
- Short-term scheduling formulation with decomposition structure for multi-purpose batch plants
- An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates
- Short term scheduling and control in the batch process industry using hybrid knowledge based simulation
- Scheduling of multistage fast-moving consumer goods plants
- Sequence-dependent batch chemical scheduling with earliness and tardiness penalties
- MOPP-I: an optimization package for multipurpose batch operations
- Retrofit of multiproduct batch plants through generalized disjunctive programming
- Scheduling in manufacturing with transportation: classification and solution techniques
- MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: a benchmark scheduling problem of the pharmaceutical industry
This page was built for publication: Scheduling multi-purpose batch plants with junction constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4230077)