Multi-objective scheduling for multi-product batch process with no-wait constraint
From MaRDI portal
Publication:5367912
Recommendations
- A study of the DEPSO-based multiproduct plants batch scheduling under uncertainty with zero wait
- Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
- Solving a bi-objective unrelated parallel batch processing machines scheduling problem: a comparison study
- A shuffled frog-leaping algorithm for multi-objective no-wait flowshop scheduling
- Bi-objective no-wait multiproduct multistage product scheduling problem with flexible due dates based on MOIDE-MA
Cited in
(9)- Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
- Bi-objective short-term scheduling in a rolling horizon framework: a priori approaches with alternative operational objectives
- Bi-objective no-wait multiproduct multistage product scheduling problem with flexible due dates based on MOIDE-MA
- A study of the DEPSO-based multiproduct plants batch scheduling under uncertainty with zero wait
- Study on complex product scheduling problem with no-wait constraint between operations
- Scheduling multi-purpose batch plants with junction constraints
- Multi-objective optimization and multi-attribute decision making for a novel batch scheduling problem based on mould capabilities
- Multi-objective operation optimization of continuous production process with safety constraints
- scientific article; zbMATH DE number 6263315 (Why is no real title available?)
This page was built for publication: Multi-objective scheduling for multi-product batch process with no-wait constraint
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5367912)