Optimal scheduling of two-component products on a single facility
From MaRDI portal
Recommendations
- Scheduling of Products with Common and Product-Dependent Components Manufactured at a Single Facility
- Optimal two- and three-stage production schedules with set-up time included
- Fabrication scheduling on a single machine to minimize the weighted sum of product completion time
- Optimal scheduling of products with common and unique components
- Optimal Scheduling of Products with Two Subassemblies on a Single Machine
Cites work
- Containing groundwater contamination: Planning models using stochastic programming with recourse
- Fabrication scheduling on a single machine with due date constraints
- Optimal scheduling of products with common and unique components
- Optimal Scheduling of Products with Two Subassemblies on a Single Machine
- Scheduling Groups of Jobs on a Single Machine
- Scheduling the production of two-component jobs on a single machine
Cited in
(9)- A survey of scheduling problems with setup times or costs
- Optimal Manufacturing of a Two Product Mix
- Scheduling N Products On A Single Facility With Back-Ordering And Eixed Terminal Inventory
- Scheduling of Products with Common and Product-Dependent Components Manufactured at a Single Facility
- Optimal scheduling of products with common and unique components
- Scheduling Groups of Jobs on a Single Machine
- On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems
- Fabrication scheduling on a single machine to minimize the weighted sum of product completion time
- A dynamic production planning and scheduling algorithm for two products processed on one line
This page was built for publication: Optimal scheduling of two-component products on a single facility
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4653447)