Scheduling N Products On A Single Facility With Back-Ordering And Eixed Terminal Inventory
From MaRDI portal
Publication:3682218
Recommendations
- SchedulingNproducts on a single facility with allowed backordering
- Optimal scheduling of two-component products on a single facility
- scientific article; zbMATH DE number 90002
- Single item lot-sizing problems with backlogging on a single machine at a finite production rate
- A Deterministic Multi-Period Production Scheduling Model with Backlogging
- Optimal pricing and production planning for multi-product multi-period systems with backorders
- Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over
- Terminal inventory level constraints for online production scheduling
- Scheduling of Products with Common and Product-Dependent Components Manufactured at a Single Facility
- Solving the capacitated lot-sizing problem with backorder consideration
Cited in
(2)
This page was built for publication: Scheduling N Products On A Single Facility With Back-Ordering And Eixed Terminal Inventory
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3682218)